Home > Operation Research calculators > PERT and CPM


1. PERT and CPM
1. Network diagram
1. Activity, Predecessors
2. Activity i-j
3. Activity i-j, Name of Activity

2. Critical path, Total float, Free float, Independent float
1. Activity, Predecessors, Duration
2. Activity i-j, Duration
3. Activity i-j, Name of Activity, Duration

3. Project scheduling with uncertain activity times (Optimistic, Most likely, Pessimistic)
1. Activity, Predecessors, to, tm, tp
2. Activity i-j, to, tm, tp
3. Activity i-j, Name of Activity, to, tm, tp

4. Project crashing to solve Time-Cost Trade-Off with fixed Indirect cost
1. Activity, Predecessors, Normal Time & Cost, Crash Time & Cost and Indirect Cost
2. Activity i-j, Normal Time & Cost, Crash Time & Cost and Indirect Cost
3. Activity i-j, Name of Activity, Normal Time & Cost, Crash Time & Cost and Indirect Cost

5. Project crashing to solve Time-Cost Trade-Off with varying Indirect cost
1. Activity, Predecessors, Normal Time & Cost, Crash Time & Cost and varying Indirect Cost
2. Activity i-j, Normal Time & Cost, Crash Time & Cost and varying Indirect Cost
3. Activity i-j, Name of Activity, Normal Time & Cost, Crash Time & Cost and varying Indirect Cost

1. An assembly is to be made from two parts X and Y. Both parts must be turned on a lathe Y must be polished where as X need not be polished. The sequence of acitivities, together with their predecessors, is given below
Activity Description Predecessor Activity
A Open work order -
B Get material for X A
C Get material for Y A
D Turn X on lathe B
E Turn Y on lathe B,C
F Polish Y E
G Assemble X and Y D,F
H Pack G
Draw a network diagram of activities for the project.
2. An established company has decided to add a new product to its line. It will buy the product from a manufacturing concern, package it, and sell it to a number of distributors that have been selected on a geographical basis. Market research has already indicated the volume expected and the size of sales force required. The steps shown in the following table are to be planned.
Activity Description Predecessor Activity Duration (days)
A Organize sales office - 6
B Hire salesman A 4
C Train salesman B 7
D Select advertising agency A 2
E Plan advertising campaign D 4
F Conduct advertising campaign E 10
G Design package - 2
H Setup packaging campaign G 10
I Package initial stocks J,H 6
J Order stock from manufacturer - 13
K Select distributors A 9
L Sell to distributors C,K 3
M Ship stocks to distributors I,L 5
(a) Draw an arrow diagram for the project.
(b) Indicate the criticla path.
(c) For each non-critical activity, find the total and free float.
 